Coded splice guide

SP07 Fiber Splicing As-Built

BASIN Cabinet 3 & 4 Terminal splice guide converted from the field drawing into searchable, scalable, print-friendly HTML/SVG.

BASIN Cabinet 3 and 4 Terminal SP07 fiber splice guide A coded fiber splicing as-built showing 12 SMF SP05 feeding BASIN 3-4 and BASIN 5-6, with fiber color labels, splice enclosure, splice schedule, and title block. city of arlington BASIN CABINET 3 & 4 TERMINAL SP07 JKWP PH2 SM FIBER BUILD SPLICE ENCLOSURE FROM COUNT FIBER X FIBER COUNT END ADMIN-BASN121 ADMIN-BASN122 ADMIN-BASN123 ADMIN-BASN124 ADMIN-BASN125X112FBASN3-4 ADMIN-BASN126X212FBASN3-4 ADMIN-BASN127X312FBASN3-4 ADMIN-BASN128X412FBASN3-4 BASN 3-465X512FBASN5-6 BASN 3-466X612FBASN5-6 ADMIN-BASN129X112FBASN5-6 ADMIN-BASN1210X212FBASN5-6 ADMIN-BASN1211X312FBASN5-6 12 SMF SP05 1 2 3 4 5 6 7 8 9 10 11 12 BASIN 3-4 1 2 3 4 5 6 BASIN 5-6 1 2 3 4 5 6 F9 11 DRAWN BY JOHN CARLSON LOCATION JKWP ARLINGTON TEXAS SP03 SYSTEM ID DESIGN PRIMARY SEGMENT SMF PHASE 2 SECONDARY SEGMENT SMF PHASE 2 CUSTOMER CITY OF ARLINGTON WATER PROJECT JKWP P2 WORK ORDER DATE 3/23/2026 DOCUMENTATION FILE SPLICE GUIDE PAGES SP07 COMMENTS

Structured splice data

SP07 splice assignments.

The coded page keeps the drawing visual while also making the splice information available as searchable data.

From Count Fiber Splice Fiber End Count End
ADMIN-BASN125X112FBASN3-4
ADMIN-BASN126X212FBASN3-4
ADMIN-BASN127X312FBASN3-4
ADMIN-BASN128X412FBASN3-4
BASN 3-465X512FBASN5-6
BASN 3-466X612FBASN5-6
ADMIN-BASN129X112FBASN5-6
ADMIN-BASN1210X212FBASN5-6
ADMIN-BASN1211X312FBASN5-6
ADMIN-BASN1212X412FBASN5-6